Tuesday April 1:
Lots of holes patched on the second floor walls. Old molding and baseboard replaced. Refrigerator is
moved back, but the plastic water line to it breaks! Caulking put on the inside corners of the tub walls.
Gutter Guards and the last shutter installed. Warped closet shelves are replaced. Door stops are put
on the sliding closet door.
Kitchen molding.
Living room molding.
Old bath molding.
Wednesday April 2:
All the ceiling lights are replaced on the first floor. The outside garage light is installed. Ruffner Home Improvement's part of the project is now complete.
New hall light to match the others.
Nice to have the real lights back up.
A light over our garage door.
Side view.
Thursday April 3:
Worked on building up the wall near the back door
Friday April 4:
Worked on building up the wall near the back door
Saturday April 5:
Worked on building up the wall near the back door