Renovation log for March 1-8


Saturday March 1:
Stairway, rail and baluster sanding.


Monday March 3:
Stairway, rail and baluster sanding. Smoke detectors are inspected.


Tuesday March 4:
Stairway, rail and baluster urethaning.
First coat of urethane. Another view.


Wednesday March 5:
Stairway, rail and baluster sanding. Final inspection for the second floor.


Thursday March 6:
Stairway, rail and baluster sanding. The last baluster is put in.
All the stairway is now in.


Friday March 7:
Stairway, rail and baluster sanding, sealing, and urethaning. A smoke detector is installed at the bottom of the stairs.
The fire inspector wanted this one. Making the stairs shine. The upper railing. Two coats of urethane.


Saturday March 8:
Stair rail and baluster sanding.