Sunday March 30:
Preparation and painting of some of the kitchen walls. Sealing of old molding and baseboard.
Primed and ready.
At least 2 walls are painted to the ceiling.
Monday March 31:
Kitchen baseboard replaced and stove reinstalled. Cellar stair railing mounted. Inside cellar door trim
installed. New tub scratches repaired. Errant hole in first floor door jamb repaired.
The basement stairs are now safe.