Renovation log for November 24-30


Monday November 25:
More siding. Drywalling is started.
Some very large pieces. Installing drywall. Measure up.


Tuesday November 26:
More siding. Tub is installed. The new front porch posts are put up.
Waiting to be put in. It's in. One side is almost done.


Wednesday November 27:
The front porch railing is put up.
Railing from the inside. A view from the side.


Thursday November 28:
Heidi finishes painting the porch lattice.


Friday November 29:
A little more siding before the snow comes.
Some on the front now.


Saturday November 30:
Just about all of the rest of the drywall is hung on the second floor except for the stairwell.
Finishing up the hallway.