Monday October 21:
Exterior walls for the second floor are framed.

South and North walls are made flat then put into place.

South wall North wall West wall East wall


Tuesday October 22:
Most of the interior walls for the second floor are framed. Start of the second floor ceiling joists.

Second floor but no roof!


Wednesday October 23:
Rain and snow combined with wind cause a minor water leak from the tarp. Kept it contained to a small area over front bedroom. Second floor ceiling joists are finshed and half of the roof rafters for the main roof are in.

Half a roof


Thursday October 24:
Remaining roof rafters are installed; and bracing throughout. The chimney was temporarily extended to be above the new roof. Plywood is put over rafters. The roofing materials arrive.

All the roof The roof is braced Covering it up Waiting for the "L"


Friday October 25:
Back roof shingled. Roof over the front "L" was built and covered in plywood.
Rafters on the "L" Plywood on the "L" Rear of House Front of House