Monday October 21:
Exterior walls for the second floor are framed.
South wall
North wall
West wall
East wall
Tuesday October 22:
Most of the interior walls for the second floor are framed. Start of the second
floor ceiling joists.
Wednesday October 23:
Rain and snow combined with wind cause a minor water leak from the tarp. Kept
it contained to a small area over front bedroom. Second floor ceiling joists are finshed
and half of the roof rafters for the main roof are in.
Thursday October 24:
Remaining roof rafters are installed; and bracing throughout. The chimney was temporarily extended to be above the new roof. Plywood is put over rafters. The roofing materials arrive.
The roof is braced
Covering it up
Waiting for the "L"
Friday October 25:
Back roof shingled. Roof over the front "L" was built and covered in plywood.
Rafters on the "L"
Plywood on the "L"
Rear of House
Front of House